Tuesday, May 31, 2011

Follow up to "Git er done"

Want to see how process is killing us? Read the following published this year, note the dates, note the use of the wording "high priority" and then note that we haven't dug up a single bucket of muck.


"This document presents the Site-Wide Remedial Investigation/Feasibility Study (Draft Site-Wide RI/FS) Work Plan for the Harris Avenue Shipyard Site (Site) in Bellingham Bay, an active shipyard located in Bellingham, Washington (Figure 1.1). The Site is one of twelve sediment cleanup sites around Bellingham Bay (the Bay) coordinated by the Bellingham Bay
Demonstration Pilot Project. The Site was identified as high priority by the Washington State
Department of Ecology (Ecology) in 2000 in a comprehensive strategy developed in cooperation
with the Bellingham Bay Demonstration Pilot Team.

No comments:

Post a Comment